欢迎进入欧博allbet官网www.ALLbetgame.us。欧博allbet开放欧博allbet登录网址、欧博allbet开户、欧博allbet代理开户、欧博allbet电脑客户端、欧博allbet手机版下载等业务。

首页社会正文

新2会员网址:GCAP completes 309.28 KWp solar PV systems

admin2022-09-2010

新2会员网址www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

G Capital Bhd executive director Datuk Yap Yee Ping

KUALA LUMPUR: G Capital Bhd’s (GCAP) 70%-owned subsidiary, Solarcity Malaysia Sdn Bhd has completed the installation and commenced operation of a 309.28 KWp Solar Photovoltaic electric power generation system (Solar PV System).

The solar PV is for the supplemental power purchase agreement (PPA) with Muda Paper Converting Sdn Bhd, a wholly-owned subsidiary of Muda Holdings Bhd inked on May 30.

,

三公大吃小www.eth108.vip)(三公开船)是用以太坊区块高度哈希值开奖的棋牌游戏,有别于传统三公大吃小(三公开船)棋牌游戏,三公大吃小(三公开船)游戏绝对公平,结果绝对无法预测。三公大吃小(三公开船)由玩家PK,平台不参与。

,

"I’m pleased to witness the completion and commissioning of 309.28 KWp add-on to Muda Paper Converting. All these small yet crucial delivery of promises will help Malaysia in reaching the target set in Renewable Energy Transition Roadmap 2035,” executive director Datuk Yap Yee Ping said in a statement.

The plant will be contributing revenue and earnings to GCAP over a span of 25 years from Aug 19, 2022, the commercial operation date.

“With the completion of the 309.28 KWp solar PV systems in Simpang Ampat, this brings our total installed solar PV systems capacity to 15.6MWp inception-to-date,” Yap said.


转载说明:本文转载自Sunbet。

网友评论

1条评论
  • 2022-09-20 00:07:29

    Social restrictions from the pandemic negatively impacted commercial subscriptions, the research house added.实力很强啊

最新评论